Stand built using 2x4's
9 Oct 2023
Plywood placed on top of stand
10 Oct 2023
Carrying plywood is easier with this tool
12 Oct 2023
One piece of birch complete
I use tape to make the cuts cleaner
These adjustable sawhorses are great
Bottom and sides complete
View from other side
Cheap corner brackets weren't the best, but they worked
Bottom, sides, and back complete
13 Oct 2023
Top borders going on
Holes cut for vents
Same on other side
Vents placed in
Other vents and top screen added
Left side platform complete
15 Oct 2023
Close-up of router work
Getting measurements for climbing hammocks
16 Oct 2023
Both platforms complete
Foam board cut into strips for back wall
17 Oct 2023
Top screen complete
18 Oct 2023
Front edges going on
19 Oct 2023
Plexiglass doors fit perfectly
Front complete
20 Oct 2023
LED "daylights" added
22 Oct 2023
UVB bulb added (mandatory for Bearded Dragons)
Reptile System Gold Infrared Heat Lamp installed. Provides consistent quality heat. Halogen bulb also added for direct high heat spot.
Used band saw to make random patterns on foam strips
23 Oct 2023
Used Dremel to make texture on strips
Used aquarium safe caulk to glue strips to a large foam board (cut to size of back of enclosure)
24 Oct 2023
Had to cut in half to get it to fit
25 Oct 2023
Coated with colored/sanded grout for texture (3 coats)
Same for other piece
Back pieces and entire interior coated with 3 layers of clear polyurethane to waterproof and prevent out-gassing
30 Oct 2023
Climbing hammocks in place. Any screws or holes covered with aquarium safe caulk for safety
Tile (helps keep toenails short) and limestone rocks (helps keep femoral pores clean) ready to go. 2-inch layer of sand will be put in before use.
3 Nov 2023
Create Your Own Website With Webador